Peningkatan Kapasitas Aparat Desa dan Masyarakat dalam Perencanaan Pembangunan

Authors

  • Jumiati Ilham Universitas Negeri Gorontalo
  • Ervan Hasan Harun Universitas Negeri Gorontalo
  • Arfan Utiarahman Universitas Negeri Gorontalo

DOI:

https://doi.org/10.37905/ejppm.v1i1.1

Keywords:

MBKM, building villages, AHSP, electricity installation

Abstract

The implementation of the Community Service Program – Building Villages this time is an integrated Community Service program with Merdeka Learning - Merdeka Campus activities which will be recognized as 20 credit hours of academic activities and spread over several courses, both contained in the curriculum and freeform courses. Based on the results of an assessment of community needs, a list of inventory problems, and a list of the potential that exists in Pontolo village, the KKN MBKM – Building Villages in 2022 has proposed 3 (three) core programs to the village government and have received approval, namely: 1). Microsoft Excel Training and Preparation of Work Unit Price Analysis (AHSP) in accordance with the Indonesian National Standard (SNI); 2). Dissemination and repair of good and safe electrical installations, and 3). UMKM training. The KKN MBKM Program – Building Villages in 2022 in Pontolo village, Mananggu sub-district, Boalemo district has produced: 1). Village officials who have skills in operating Microsoft Excel and are also able to prepare a Cost Budget Plan (RAB) based on Work Unit Price Analysis (AHSP) in accordance with the Indonesian National Standard (SNI); 2). Community groups who have knowledge and skills in making good and safe electrical installations based on and as many as 43 housing units have been successfully reinstalled (reinstalled) based on the General Guidelines for Electrical Installation (PUIL); and 3. Community groups who have knowledge in developing UMKM.

References

Kementerian Desa, Pembangunan Daerah Tertinggal dan Transmigrasi. (2020). Rencana Strategis Kementerian Desa, Pembangunan Daerah Tertinggal dan Transmigrasi 2020 – 2024. https://www.kemendesa.go.id/berita/assets/files/final_4_RENSTRA_KEMENDESA_PDTT_Tahun_2020-2024_(21_Desember_2020)_opt_(1).pdf.

Dwi Hadya Jayani. (2020). Alokasi Dana Desa dalam RAPBN 2021. https://databoks.katadata.co.id/datapublish/2020/08/25/berapa-alokasi-dana-desa-dalam-rapbn-2021.

Kementerian Keuangan Repulblik Indonesia. (2022). Workshop Formulasi Pengalokasian Dana Desa Berbasis Kinerja. https://www.ciptadesa.com/2022/08/arah-kebijakan-dd-2023.html

Nidaur Rahmah. (2019). Pengertian Rencana Anggaran Biaya (RAB), RAP, dan Contoh Format RAB Pekerjaan Konstruksi. https://www.pengadaanbarang.co.id/2019.

Lubis Muzaki. (2019). Produktivitas Tenaga Kerja: Pengertian, Faktor-faktor yang Mempengaruhinya, dan Manfaat Pengukuran Produktivitas. https://www.pengadaanbarang.co.id/2019/0 9/produktivitas-tenaga-kerja.html.

Badan Pusat Statistik Kabupaten Boalemo. (2022). Kabupten Boalemo Dalam Angka. https://boalemokab.bps.go.id.

Badan Pusat Statistik Kabupaten Boalemo. (2020). Kecamatan Mananggu Dalam Angka. https://boalemokab.bps.go.id.

Sirwan. (2020). Pelatihan Dasar TIK untuk Meningkatkan Kemampuan Aparat Desa dalam Pelaksanaan Adminisrasi Desa. Jurnal Pengabdian Pada Masyarakat, 8(1), 25-30.

Purba, H., Sukmawati, A., Muhammad Hifdzi Adini, & Delsika Pramata Sari. (2018). Pemanfaatan Teknologi Informasi dan Komunikasi pada Lingkungan Pemerintahan Desa di Kecamatan Sungai Pandan. Jurnal Bisnis Dan Pembangunan , 7(1).

Downloads

Published

2023-04-04

How to Cite

Ilham, J., Harun, E. H., & Utiarahman, A. (2023). Peningkatan Kapasitas Aparat Desa dan Masyarakat dalam Perencanaan Pembangunan . Jurnal Pengabdian Pada Masyarakat Eldimas, 1(1), 08–17. https://doi.org/10.37905/ejppm.v1i1.1